First of all, the polyurethane sandwich panel base wall should meet the requirements of the specification, and it has been checked and accepted.

pu sandwich panel production line

The construction of the polyurethane sandwich panel project should be carried out after the base layer is painted with a cement mortar leveling layer and the construction quality is qualified.

Before the construction of the thermal insulation project, the outer door and window openings should pass the acceptance, the size and location of the openings should meet the design requirements and the acceptance should be qualified. The door and window frames or auxiliary frames should be installed and waterproofed. The embedded parts and connectors of fire ladders, downpipes, various entrance pipelines and air conditioners that extend out of the wall should be installed, and the thickness of the polyurethane sandwich panel should be reserved.

pu sandwich panel production line

External wall scaffolding for the installation of insulation boards is required, and the scaffolding should be stable and reliable.

The ambient temperature during construction should not be higher than 35℃, should not be lower than 5℃, and should not be lower than 0℃ within 24h, and the wind should not be higher than level 5. Rainproof measures should be taken during construction in rainy days.

pu sandwich panel production line

The incoming materials of polyurethane sandwich panels should be stored in a dry and cool place, and the storage period and conditions should be in accordance with the requirements of the material supplier’s product description.

The above is the construction requirements for polyurethane sandwich panels brought to you today. Sinowa is engaged in pu sandwich panel line equipment and has unique insights on the process of color steel insulation panels. More customers are welcome to come to consult.

Page Url: http://www.ocfs.cn/en/six-conditions-that-need-to-be-met-in-the-construction-of-pu-sandwich-panel-production-line.html

You are here: Home / News / Six conditions that need to be met in the construction of pu sandwich panel production line
Contact Us
Email: sinowa@sinowa.cn
Call: +0086 151 0610 6366
Add: High-tech Industrial Development Zone, Zhenjiang, China
主站蜘蛛池模板: 搡老熟女国产| 四虎成人精品国产永久免费| 国产小屁孩cao大人| 亚洲区小说区激情区图片区| 国产亚洲av无码av男人的天堂| 88国产精品视频一区二区三区| 亚洲国产精品日韩av专区| 妺妺窝人体色777777| 少妇久久久久久被弄到高潮| 一本大道东京热无码| 免费又黄又爽又色的视频| 中文字幕av无码一区二区三区| 国产成a人片在线观看视频下载| 越南女子杂交内射bbwbbw| 亚洲乱人伦中文字幕无码 | 欧美 日韩 国产 成人 在线观看| 亚洲国产成人久久综合区| 亚洲精品无码av人在线观看| 国产精品久久久爽爽爽麻豆色哟哟| 色天使久久综合网天天| 色丁狠狠桃花久久综合网| 无码欧美毛片一区二区三| 97人妻人人做人碰人人爽| 欧洲熟妇色xxxx欧美老妇免费| 欧美丰满熟妇xxxx| 99国产精品人妻噜啊噜| 人妻精品无码一区二区三区| 久久老子午夜精品无码| 亚洲国产精品一区二区美利坚| 久久久午夜精品福利内容| 伊人色综合久久天天人手人婷| 最大胆裸体人体牲交免费| 在线观看午夜亚洲一区| 精品伊人久久久大香线蕉下载| 国产精品久久久久久日本| 日韩人妻熟女中文字幕| 久久综合给合久久狠狠狠97色69| 国产99视频精品免视看7| 欧美乱人伦人妻中文字幕| 人妻精品久久无码区| 日韩精品中文字幕无码一区|